Sasol Recognizes MMR’s Outstanding Safety Execution Efforts
September 25, 2019
BATON ROUGE, La. – Sasol held a safety luncheon to recognize MMR and its employees working on the MIC and Paga Projects at its Lake Charles Chemical Complex in Westlake, LA. The management of Sasol commended MMR’s outstanding safety execution efforts throughout the entire site.
Key highlights of the MIC and Paga projects include:
Hours Worked • 151,700
Project Duration • 17 months
Safety • 0 Near Miss • 0 incidents
Preventive Measures • 26,481 MMR BBS Inspections • 6800 JSA Audits • 622 Sasol BBO • 1027 Site Audits
Work Performed • Conduit – 58,020’ (10.99 Miles) • Power Cable – 59,597' (11.29 Miles) • Speaker Wire – 454,747’ (86.13 Miles) • Fiber Optic Cable – 578,984’ (109.66 Miles) • Speaker Terminations – 5,389 • Power Terminations – 1,941 • Fiber Terminations – 4,516 • Devices Installed – 1,168
Job Production Factor • 1.008 (Over 1 is productive)

Latest News
-
MMR Recognizes Longstanding Employees for Dedicated Service at Annual Christmas Celebration
January 12, 2023 -
MMR Named Largest Electrical Contractor in Region, Largest Specialty Contractor in Louisiana by Engineering News-Record of Texas & Louisiana
January 5, 2023 -
MMR Proudly Celebrates Its Fall Graduates, All Accept Full-Time Positions
December 28, 2022 -
MMR Receives Awards of Excellence, Merit Awards for Outstanding Project Performance by ABC
December 21, 2022 -
MMR Employees Join The Salvation Army Baton Rouge in Granting Christmas Wish Lists
December 9, 2022